HOME > Business > Thilawa Area 230kV Transmission Line and Substation Project(2017)

Thilawa Area 230kV Transmission Line and Substation Project(2017)

《Background of the project》
A rapid growth in years happens because they have been undertaking a dimerization and a national reconciliation. Therefore, ODA loan was agreed by Japanese government to the infrastructure provision project. In this project, we constructed of new substation and transmission line. Beside we rehabilitated an existing substation at site. We contributed to the society and improve living standard.

《Project outline》
Project: Thilawa Area 230kV Transmission Line and Substation Project.
Client: Department of Power Transmission and System Control, Ministry of Electiricity
Site : Thilawa district, Myanmar
Outline of construction:
  1) 230/33/11kV Construction of new substation (Tilawa Area)
  2) 230/33/11kV Rehabilitation of existing substation (Thanlyin Substation)
  3) 230kV Construction of 230kV transmission line (16km of a full turn-key project)



  Substation in Tilawa 1   Substation in Tilawa 2
  Substation in Tilawa 1   Substation in Tilawa 2
  230kV Switch yard   Control building
  230kV Switch yard   Control building
  Transmission Line 1   Transmission Line 2
  Transmission Line 1   Transmission Line 2
  Transmission Line 3   11 Puppies born at site
  Transmission Line 3   11 Puppies born at site