<<Project Background>>
In Rwanda, the electrification rate was 24.5% in 2015. Also, the electric generator’s installed capacity was 160MW, which was still too low. The distribution network was insufficient. The capital, Kigali accounted for 64% of all electricity consumption. However, the electric power supply was not enough for the electricity consumption. Therefore, it was afraid that the unstable electricity supply could cause some problems for economic activity and people’s lives. Through this project, we built new substations and supported the village of Ndrera, Kigali to rebuild and spread its distribution network. We will continue to contribute toward the stabilization of the electric supply and the improvement of the economy in Rwanda.


Project Profile
Project Name: The Project for Improvement of Substations and Distribution Network (Phase 2)
The Client: Energy Development Corporation Limited (EDCL)
The Contractor: Nishizawa LIMITED
The Content:
1) Newly-established 110/15kv substation (Ndera substation)
2) 15kv distributor addition of 110/15kv substation (Gasogi substation)
3) Newly-established 110/15kv Switching Station 2places (Kabuga,Murindi)
4) Construction of 110kV transmission line
5) Construction and upgrade of 15kV distribution line (Route 1-about 6.5km, Route 2-about 0.6km)


  Ndera Substation   Kabuga Substation
  Ndera Substation   Kabuga Substation
       
  Murindi Substation    