HOME > Business > The Republic of Uganda / Contract of the Capacity Development Project for Improvement of Protection of Transmission Systems

The Republic of Uganda / Contract of The Capacity Development Project for 
    Improvement of Protection of Transmission Systems 
 

We have contracted the captioned project with Japan International Cooperation Agency (JICA). Due to the increasing trend of power demand caused by economic growth in Uganda, electricity outage and failure in transmission line and substation are the serious issues. In this project, we aim to improve the stable power supply by installing the monitoring system and analyzing software.

Through this project, we contribute to the SDGs goal 7 “Affordable and Clean Energy” and goal 9 “Industry, Innovation and Infrastructure”

 
《Project Outline》

Project name: Capacity Development Project for Improvement of Protection of Transmission Systems in Uganda

Project fund: JICA Technical Cooperation

End user: Uganda Electricity Transmission Company Limited (UETCL)

Client: Japan International Cooperation Agency (JICA)

Our scope of work: Procurement and installation of
 
   1. Fault recorder unit
   2. Fault locator unit
   3. Integrated Measuring Equipment
   4. Transmission System Analyzing software