The Project for Improvement of Substations and Distribution
Network at metropolitan area in Kigali (2014)
《Background of the project》
The Republic of Rwanda has been boosted the economic growth rate these days. However, because of a long civil war tires economy so the overall electrification rate is 5%, even Kigali, the capital of Rwanda, is 25%, and some rural areas are around 3%. The issue they reconstruct the economy is the lower electrification rate to improve a living standard and social service. We contributed to increase the rate and let the electric supply stable by improving Substations and Distribution at the Metropolitan area in Rwanda.
《Project Profile》
Project :The Project for Improvement of Substations and Distribution Network at Metropolitan area in Rwanda
Client :The Government of the Republic of Rwanda & Energy, Water and Sanitation Authority(EWSA)
Site :Metropolitan area of Kigali, Rwanda
Outline of construction :Construction of 5 Substations and distribution network
1) Jabana Substation (10MVA x 2Bank) Construction(Existing)
2) Musha Substation (10MVA x 1Bank) Construction(New)
3) Rwinkwavu Substation (6MVAx1Bank) Construction(New)
4) Gikondo Substation (110kV outside equipment)
5) Birembo Substation (70kV Feeder to 110kV)
6) 30kV, 15kV, 400V distribution line
1.Rehabilitation of power grid and expansion of the site
We undertook some construction works for aerial distribution line and Underground distribution lines
Aerial distribution line
Route 1 | ||
Route 2 |
Underground distribution lines
2.Rehabilitation of substation and upgrade of the site
Rehabilitation of these 5 substation as following below.
Gikondo substation |
||
Javana substation |
||
Birembo substation | ||
Musha substation |
||
Rwinkwavu substation |